Home battery backup load selection diagram
ElectrificationJune 2026·6 min read

What Can a Home Battery Power? Choosing Your Backup Loads

A home battery cannot power everything indefinitely — but the right load selection keeps your most important appliances running through a blackout.

When a blackout hits, a home battery does not automatically power your entire house. Most residential systems are designed to back up selected circuits — the appliances and outlets you pre-select during installation. Choosing those loads wisely determines whether your battery lasts hours or days.

Backup Load Tiers

PriorityTierTypical examples
Essential — always backed upTier 1Fridge/freezer, lighting, phone chargers, Wi-Fi router, medical devices
Common additionsTier 2Microwave, television, laptops, security cameras
Consider carefullyTier 3Split system AC, well or pressure pump, chest freezer
Rarely backed upTier 4EV charger, electric dryer, electric oven, electric hot water system

Why Not Back Up Everything?

  • Cost — whole-home backup requires significantly more battery capacity, raising installation cost sharply
  • Capacity — a 10 kWh battery depleted in 2 hours by high-draw appliances gives you no overnight coverage
  • Surge power — motors like split system compressors draw 3–5× their running wattage at startup
  • Energy hierarchy — a fridge protecting food over three days is more valuable than one hour of air conditioning

Estimated Runtimes

These estimates assume baseline loads: fridge, Wi-Fi, phone chargers, some lighting, television and two laptops.

Battery sizeLoadsSunny dayCloudy day (no solar top-up)
10 kWhEssentials only7+ days36–48 hours
10 kWhEssentials + split system AC7+ days6–10 hours
20 kWhEssentials only7+ days72+ hours
20 kWhEssentials + split system AC7+ days14–20 hours

The single biggest decision: include or exclude your split system air conditioner. Dropping it from a 10 kWh system can multiply cloudy-day runtime from 8 hours to two days.

Plan Before You Install

Backup load selection should be decided during the installation design phase, not after. Adding circuits to a backup system post-installation requires a licensed electrician to run additional wiring — it is easier and cheaper to plan upfront. Ask your installer to walk through each circuit in your switchboard and help you prioritise.